Greta Workers Club Bowling Green Conversion

Synthetic Sports Group completed the full design, construction and conversion of an existing natural grass bowling green at Greta Workers Club. Completed in March 2025, the project delivered the first Synthetic Sports Group GreenMaster Platinum Gold surface on the East Coast.

The project involved transforming the existing natural turf green into a high-performance synthetic bowling surface designed for year-round play, consistent roll and reduced maintenance. From initial site assessment through to final installation, the works were carefully planned to deliver long-term durability and premium playing characteristics.

A fully integrated drainage system was designed specifically for the site conditions. With the unique land profile and increasing intensity of weather events, sub-surface drainage was critical to protecting the structural base, managing water efficiently and maintaining surface quality over time.

Project Details

Client: Greta Workers Club
Location: Greta, NSW
Category: Bowling Green Conversion
Completed: March 2025
Surface: SSG GreenMaster Platinum Gold
Scope: Full design, construction and conversion

Surface System

The installation incorporated four Advanced Polymer Technology Asia Pacific products:

SSG GreenMaster Platinum Gold for the main bowling surface, delivering true roll and elite-level playability.

SYNLawn Comfort Plus for the surrounds, creating a durable, clean and low-maintenance perimeter finish.

SYNLawn CoolPlay Gravel on the ditch walls to improve resilience and temperature performance.

HB 250 within the ditches to support structural integrity and long-term performance.

The Result

The completed facility provides Greta Workers Club with a reliable, high-quality synthetic bowling green built for performance, longevity and everyday club use. The new surface supports competitive play, club events and community engagement throughout the year.